PAUL H. DENT
Significant
Project List 1987-2010
By
"significant" I
mean projects which I have directly managed, or on which I've worked
for
an extended time, or for other reasons have contributed to my
professional development. The projects are organized by
employment and role, with the most recent first. My independent
projects can be found at the bottom.
Back
to Paul's Architecture Page
PROJECTS
WITH
ARCHITECTURAL FIRMS
KODAMA
DISENO ARCHITECTS
& PLANNERS, San Francisco, CA
Project
Manager
- Edith
Witt Senior Community (aka 9th & Jessie Senior
Housing) 11 story
concrete high-rise with 107 senior apartments
- (In association with Architect
of Record KMD Architects)
- San Francisco, California
- Status: Completed 2010
- Cost: $35 million
- Role: Project
manager, SD through completion; design, especially interiors;
80% of construction documents; all permitting; construction
administration
- Acacia
Meadows 16
multifamily housing buildings (140 units) on an 8 acre site
- West Sacramento, California
- Status: Completed 2006
- Cost: $18 million
- Role: Project
manager, DD through CD; 50% of construction documents; all permitting
-
- DeAnza
Gardens 21
multifamily housing buildings (180 units) on a sloping 13 acre site
- Bay Point, California
- Status: Completed 2005
- Cost: $30 million
- Role: Project
manager, DD through completion; oversaw CD production; all permitting;
construction administration
- Presidio Village 104 independent senior apartments in 4 - 4 story
buildings
- San Francisco, California
- Status: Completed 2004
- Cost: $12 million
- Role: Project manager, DD through CD; oversaw
CD production; all permitting
-
- Pacific Gardens Courtyard building with assisted living
and dementia facilities
- Santa Clara, California
- Status: Completed 2003
- Cost: $8 million
- Role: Project
manager, DD through CD; oversaw CD production; all permitting
Project
Assistance
- The Aldea Center on
Mt. Sutro Community
center for UCSF student housing
- San Francisco, California
- Status: Under construction
- Cost: $1.4 million
- Role: Project
architect; CD review; detailing; permitting with DSA
ELS
ARCHITECTS,
Berkeley, CA
Architect
- Berkeley High School Practically an entire campus in one building
- Berkeley, California
- Status: Completed 2003 (approx.)
- Role: Project
architect (primarily structural and mechanical coordination)
- Fox California Theater Elaborate renovation and conversion of a 1927
movie palace into an opera house
- San Jose, California
- Status: Completed 2004
- Role: Project
architect (primarily interior coordination)
- The Village at Merrick
Park Huge,
upscale Mediterranean-style indoor/outdoor retail complex
- Coral Gables, Florida
- Status: Completed 2002
- Role: Project
architect (primarily structural and precast concrete coordination)
FRANTS
ALBERT ASSOCIATES,
Oakland, CA
Project
Manager
- Mt.
View Sanitary District Administration Building New headquarters for an innovative waste treatment
facility
- Martinez, California
- Status: Completed 2003
- Cost: $2.5 million
- Role: Project
manager, SD thorough CD; all design and drawings; all permitting
HOLEY
ASSOCIATES,
San Francisco, CA
Project
Manager/Architect
- KFTV Channel 21 Expansion and reorganization of television station
offices
- Fresno, California
- Status: Completed 1999
- Role: Project
architect; interior design; systems coordination; permitting
- Cellular One Retail space in historic building at 3rd &
Market
- San Francisco, California
- Status: Completed 1998
- Role: Project
architect; interior design; permitting
- Robertson, Stephens
& Co. Communicating Stair Elaborate curved stair in high-rise office building
- San Francisco, California
- Status: Completed 1997
- Role: Project manager, SD though CD; design; all drawings; permitting; some construction administration
-
- Marines Memorial Club Various renovations to mixed-use building in
downtown San Francisco
- San Francisco, California
- Status: Completed 1995-97
- Role: Project manager (various projects)
- Project Open Hand Construction administration for large commercial
kitchen and meals distribution facility
- San Francisco, California
- Status: Completed 1997
- Role: Construction administration after Holey took over project from original architect
- Applied Materials
Building 8 Various
reconfigurations of office and chip production space
- Santa Clara, California
- Status: Completed 1995-98
- Role: Project manager (various projects)
Project
Assistance
- Monsanto
Executive Suite
Large, high-end office space with many innovations
- Creve Coeur, Missouri
- Status: Completed 1997
- Role: Project architect; detailing
- Wired Magazine
Communicating Stairs
Rugged, low-cost metal stairs for the trendy online magazine
- San Francisco, California
- Status: Completed 1996
- Role: Project architect; detailing
THEODORE
BROWN &
PARTNERS, INC., San Francisco, CA
Project
Manager
- 1440
Kearny Street Condominiums New 2 unit building atop Telegraph Hill
- San Francisco, California
- Status: Completed 1996
- Role: Project manager, SD though CD; all drawings; permitting; some construction administration
- Hung
On Tong Headquarters Building Mixed-use brick and copper building in the heart
of Chinatown
- San Francisco, California
- Status: Permitted but never
built
- Role: Project manager, SD though CD; all drawings; permitting
GRINSTEIN/DANIELS,
INC.,
Culver City, CA
Project
Architect / Job Captain
- Tsunoda Residence
Remodel Residential
remodel
- Los Angeles, California
- Status: Completed
1993
- Role: Project architect; all drawings; permitting; some construction administration
- Cal-Arts
Studios
Cluster of artists' studios for the prominent arts college
- Valencia, California
- Status: Completed 1992
- Role: Project architect, SD through CD; all drawings; permitting; construction administration
- Opus
Restaurant
Sumptuous restaurant for noted chef Eberhard Muller
- Santa Monica, California
- Status: Completed 1992
- Role: Job captain, SD through CD; all drawings; permitting; construction administration
- Harris Residence Large residential remodel with new guest house
- Malibu, California
- Status: Completed
1992
- Role: Job captain, SD through CD; all drawings; permitting; construction administration
- Roy's Kahana Bar and
Grill The second in
a rapidly growing line of restaurants for Roy Yamaguchi
- Kahana, Maui, Hawaii
- Status: Completed 1991
- Role: Job captain, SD through CD; all drawings; some construction administration
- Rosamund
Felsen Gallery
Gallery for the well-known art dealer
- West Hollywood, California
- Status: Completed 1990
- Role: Job captain, SD through CD; all drawings; permitting; construction administration
- Grode Residence
Addition Residential
remodel and addition
- Los Angeles, California
- Status: Completed 1990
- Role: Job captain, SD through CD; all drawings; permitting; construction administration
- New Hope Apartments
for HIV/AIDS 12-unit
apartment building with many amenities
- San Pedro, California
- Status: Redesigned and
completed 1998
- Role: Job captain, SD through CD
Project
Assistance
- 110 N. Robertson
Boulevard Retail
showroom in the design district
- Los Angeles, California
- Status: Completed 1991
- Role: DD and CD assistance; construction administration
- El Chaya Completed 1991
- Chaya Diner Completed 1989
- Restaurants on the Sunset Strip
- Los Angeles, California
- Role: CD assistance; detailing
- Chaya Venice Second in a series of quality restaurants
- Venice, California
- Status: Completed 1990
- Role: CD assistance; detailing
- Kentucky Fried Chicken Gehryesque signature building for the
forward-thinking owner
- Los Angeles, California
- Status: Completed 1989
- Role: Detailing; some construction administration
PROJECTS
AS AN
INDEPENDENT CONTRACTOR
FISHER-FRIEDMAN
ASSOCIATES,
San Francisco, CA
- Stern Hall Renovation 230 unit dormitory remodel
- Stanford University, Palo Alto,
California
- Status: Completed 1995
- Role: Project architect; some CDs; construction administration
- Redwood City Hall
- Redwood City, California
- Status: Completed 1997
- Role: Project architect, DD
JEFFREY
DANIELS AIA,
Los Angeles, CA
- Residence
Addition
Includes circa
'92 high-tech media room
- Los Angeles, California
- Status: Completed 1994
- Role: Job captain; all drawings; permitting; some construction administration
- Brita Daniels
Residence Addition
Remodel and addition
- Los Angeles, California
- Status: Completed 1990
- Role: Job captain; all drawings; permitting; some construction administration
JOHN
VON SZELISKI &
ASSOCIATES, Newport Beach, CA
- Sunnyvale Performing
Arts Center
- Project
- Lancaster Performing
Arts Center
- Project
- Poway Performing Arts
Center
- Project
PROJECTS
EXECUTED
INDEPENDENTLY
- Berman-Tallman
Residence Stair
addition to dramatic but congested house
- San Francisco, California
- Status: Completed 2001
- Role: Design; all drawings; permitting; some construction administration
- Koch Residence Remodel Expansion of living room
- San Francisco, California
- Status: Completed 1996
- Role: Design; all drawings; permitting
- Dent Residence Gardens For the architect's parents' house
- Sherman Oaks, California
- Status: Completed 1996 (and
ongoing)
- Decision Research
Office Office for
political consulting firm
- San Diego, California
- Status: Completed 1992
- Role: Design; all drawings
- Grinstein Addition An apartment for the owners' cook
- Los Angeles, California
- Status: Completed 1991
- Role: Design; all drawings; permitting; some construction administration
Back
to Paul H. Dent Architect